Hosur · Tamil Nadu · Verified procurement data
Building material prices
in Hosur
Last updated: June 2026Next update: July 2026
Current rates for seven key construction materials in Hosur. Sourced from Design Intend's active project procurement records. All prices are ex-dealer — GST (18%) and transport are not included.
Current rates — June 2026
| Material | Unit | Current range | vs last month | Recorded |
|---|---|---|---|---|
Aggregate, 20mm Ex-dealer · excl. GST & transport | per cft | ₹42–₹52 | ▲ 4.4% | June 2026 |
Cement, OPC 53 grade Ex-dealer · excl. GST & transport | per 50kg bag | ₹370–₹390 | ▲ 1.3% | June 2026 |
Concrete blocks, 8 inch Ex-dealer · excl. GST & transport | per piece | ₹40–₹48 | ▲ 4.8% | June 2026 |
M-sand Ex-dealer · excl. GST & transport | per cft | ₹55–₹65 | ▲ 5.3% | June 2026 |
Red bricks Ex-dealer · excl. GST & transport | per piece | ₹8–₹10 | ▲ 5.9% | June 2026 |
River sand Ex-dealer · excl. GST & transport | per cft | ₹65–₹80 | ▲ 3.6% | June 2026 |
TMT steel, Fe500 Ex-dealer · excl. GST & transport | per kg | ₹58–₹62 | ▲ 1.7% | June 2026 |
All rates ex-dealer · Excluding GST (18%) and transport · Typical residential quantities
12-month trend
Midpoint of recorded min–max range. Cement (₹/bag) and TMT steel (₹/kg).
How we source these prices
Prices are sourced on the first of each month from Design Intend's active project procurement records and direct supplier quotes in Hosur. Design Intend is an architecture and construction studio with ongoing projects across Hosur, Attibele, and Krishnagiri. These are the rates the firm actually pays for current projects — not published list prices, not estimates. Every row in the table names the source and date it was recorded. Prices are ex-dealer: GST (18% on most materials) and transport (₹2–8 per unit depending on distance and volume) are not included.
Frequently asked questions
Planning to build?
Get a full construction cost estimate for your plot.
Material rates are one input. Our construction calculator combines them with labour, supervision, and finishes to give you a full project range — by plot size and quality tier.